
GVD designs and builds decks in Orangevale and nearby Fair Oaks and Granite Bay, with heat-conscious board colors for full-sun decks. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
GVD Renovations designs, permits, and builds decks in Orangevale, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by Sacramento County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby Fair Oaks, Granite Bay, and Carmichael, and every design starts with a measurement of your grade and attachment point.
Start with how you plan to use the deck, because whether it holds a dining table for six, a grill and a couple of chairs, or a path down to the yard changes the size, the stair count, and where the railing has to run. Each of those choices then sets the framing underneath, so the use case drives the structure rather than the other way around. We ask what will sit on the deck before we measure anything, since the answer determines the plan you will approve.
A deck is a structural project wearing a finish product, and the part that decides whether it lasts is the framing and the ledger rather than the boards on top.
Height above grade is the single measurement that moves a deck budget the most, because it sets footing depth, how much structural support the frame needs, whether a guardrail is required, and which permit path the project follows all at once. Knowing where your deck sits relative to the ground before you call keeps the cost conversation grounded in your actual site.
The useful question at the outset is not which board you want but what the grade and the attachment point are going to require underneath it.
| Deck | Typical cost | What sets it apart |
|---|---|---|
| Composite, standard size | $17,000–$30,000 | Low upkeep, the usual choice |
| Redwood | $25,000–$35,000 | Real wood look, periodic refinishing |
| Full PVC or stone surface | $30,000–$45,000 | Top moisture and stain performance |
| Large custom, covered, or waterproofed | $45,000–$100,000+ | Framing and engineering set the price |
For scale at the low end: a ground-level pressure-treated deck under 100 square feet runs near $5,000, which is the smallest project worth mobilizing a crew for.
The complete cost breakdown is on our main decking page.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
Comparing decking materials on upfront cost alone is unreliable here, because the price order depends on which wood you are actually comparing against.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Note the cost order, because it is the reverse of the usual assumption: redwood sits above standard composite here. The wood option is a premium material rather than a budget one, so the composite decision is not about paying more now to save later.
Summer sun is the stress to design for in Orangevale. Dark composite and PVC boards run hotter underfoot than light ones, and unshaded redwood weathers faster under strong UV. For a south- or west-facing deck, a lighter board color, a shade structure, or both usually matter more than the brand.
Ask to see full-size boards rather than samples. Color and texture read very differently at scale, and that is the decision you live with.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
If the deck attaches to the house or sits more than 30 inches above grade, expect Sacramento County to require a permit and inspections. A low freestanding structure may not trigger one.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
When a permit is required, we draw the plans, submit them to Sacramento County, and schedule each inspection ourselves.
Deck framing is governed by the same structural provisions as any exterior structure, and the inspections follow the order the load path is built in.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
On a lot where the ground falls away from the house, the deck becomes a framed structure carrying real load rather than a platform sitting on the yard.
Two houses on the same street can need very different structures underneath the same size deck, depending entirely on grade.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
A deck cannot be compressed by working out of sequence. The open-framing inspection in particular has no substitute.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
Most residential deck replacements finish in one to three weeks of on-site work once permits clear.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
What composite asks of an owner is a hose and occasional soap. What wood asks is a refinishing cycle, and that is the whole difference.
We put the full scope and one fixed price in a detailed digital proposal, so on a job where the site itself sets the structural work, the number you approve is the number you pay and there are no surprise charges once the crew is on site. That matters most when footings, support, and guardrails are dictated by the ground under the deck rather than by what you asked for. The work is carried out by one accountable GVD team from quote to walkthrough, so the person who measured your grade is connected to the people framing it. When a permit is required, GVD handles the permitting process with Sacramento County, and we build to the footing and attachment details county inspectors review. In a county where the median home value is $563,000 that detailed total protects the number you planned around.
Our deck submittals are prepared for what Sacramento County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.
We bring the same crews, materials, and workmanship to every community around Orangevale.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with Sacramento County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















