
GVD designs and builds decks in Nevada City and nearby Colfax and Alta Sierra, designed for hot days, cool nights, and sloped lots. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
Homeowners in Nevada City hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through the City of Nevada City or Nevada County when a permit applies, and build it under California license #989637 with full insurance. We also build decks in nearby Colfax, Alta Sierra, and Grass Valley, and every design starts with a measurement of your grade and attachment point.
The first material decision on a deck is whether you want to sand and reseal wood on a recurring cycle or move to a composite or capped board that skips that cycle entirely. Wood decking asks for cleaning and refinishing at intervals to hold its color and surface, while composite lines carry factory finishes that change what maintenance looks like over the life of the deck. Deciding which cycle you are choosing into shapes the board you should be pricing, so we start there before any layout drawing.
Our project managers are GVD staff, and the same one owns the job from the first measurement through final sign-off, including the inspections.
Height above grade sets footing depth, how much structural support the frame needs, whether code requires a guardrail, and which permit path the project follows, all at once. That single measurement is why two decks of the same square footage can carry very different numbers, so we measure it at the estimate before quoting one fixed total.
Three things move a deck budget more than the board selection does: the size, whether the deck needs new footings, and how far it sits above grade.
For scale at the low end: a ground-level pressure-treated deck under 100 square feet runs near $5,000, which is the smallest project worth mobilizing a crew for.
Our main decking page walks through pricing in more detail.
Two quotes for the same footprint usually differ mainly on the surface material, since the framing, footings, and railing underneath carry a similar base cost. What pushes an elevated or second-story deck higher is the deeper footing work and added structure.
Material choice on a deck is a maintenance-commitment decision. Homeowners who will not refinish on a cycle should not specify wood, whatever the price.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Most decking advice assumes wood is the cheap option and composite the upgrade. That holds for pressure-treated pine and not for redwood, which is what sits in the wood tier above.
Nevada City's foothill climate brings hot, dry summers and wide day-to-night temperature swings. Composite and PVC boards expand and contract with that cycling, so we follow each manufacturer's gapping and fastening specifications closely, and lighter colors stay more comfortable underfoot in the afternoon sun.
Where the brands genuinely diverge is at the top of their ranges, and that is also where the price separation appears.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
Any deck that connects to the house, or that will need a guardrail, should be checked against the current requirements of the City of Nevada City or Nevada County before construction is scheduled.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
GVD prepares the plans, submits for plan check, and schedules the inspections with the City of Nevada City or Nevada County when a permit applies, so you are not tracking down a separate expediter.
Most of what code requires on a deck is invisible in the finished product, which is exactly why the inspection stages are sequenced the way they are.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
Many lots around Nevada City sit in or near designated Wildland-Urban Interface areas, where California adds requirements for exterior construction that can affect decking material and how the deck meets the house. We check the specific product listings against current WUI code before ordering, rather than assuming a board qualifies.
Elevated decks concentrate their cost below the decking, in footings and posts, which is why two decks of identical square footage can price very differently.
How fast the ground falls away from the house sets the footing depth, the post sizing, and the guardrail requirement, so the site survey comes before the design.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
This is the standard sequence across the trade. A contractor proposing to reorder it should be able to say exactly why.
The steps cannot overlap much: nothing goes on top until the footings and framing are signed off.
Construction generally runs one to three weeks. The part that varies most is what comes before it, since plan check queues move at their own pace.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
Keeping a deck clean is mostly about preventing grit from being ground into the surface underfoot, which is why sweeping matters more than washing.
We carry several decking lines rather than a single stocked product, so the board we recommend follows what your project actually needs, whether that is a wood you plan to refinish or a capped composite you would rather not. A national franchise often steers you toward the line it inventories, which narrows your options before your deck is even measured. Our in-house crews, who self-perform most of the work, build the frame and set the boards as one coordinated team, so the person who measured the height above grade is accountable for the result. When a permit is required, GVD handles the permitting process with the City of Nevada City or Nevada County, and we know which footing and ledger details each authority looks at before framing inspection.
Our deck submittals are prepared for what the City of Nevada City or Nevada County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.
We bring the same crews, materials, and workmanship to every community around Nevada City.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the City of Nevada City or Nevada County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















