
GVD designs and builds decks in Arden Arcade and nearby Citrus Heights and Carmichael, built for long, hot summers and strong sun. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Arden Arcade homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
Homeowners in Arden Arcade hire GVD Renovations for everything from simple ground-level decks to multi-level structures. We design the deck, take it through Sacramento County when a permit applies, and build it under California license #989637 with full insurance. Recent site visits have ranged from Sierra Oaks and Del Paso Manor to nearby Citrus Heights and Carmichael, and every design starts with a measurement of your grade and attachment point.
Two deck quotes are only comparable when they cover the same footprint, assume the same height above grade, and rely on the same attachment method, whether the deck ledgers to the house or stands freestanding on its own posts. A photograph of a finished deck shows none of these three, so a lower number often reflects a smaller footprint or a cheaper attachment assumption rather than a better price. We fix all three at the estimate and quote one firm total against them.
We commit to a firm total price before work starts, which is possible because the structural scope gets settled at the estimate rather than discovered during framing.
The only deck number worth comparing between companies is a firm total for a defined footprint that states the height above grade it assumes and whether it counts on ledger attachment or a freestanding frame. Once those are pinned down, the number you approve is the number you pay, with no surprise charges once the crew is on site.
The useful question at the outset is not which board you want but what the grade and the attachment point are going to require underneath it.
For scale at the low end: a ground-level pressure-treated deck under 100 square feet runs near $5,000, which is the smallest project worth mobilizing a crew for.
For the full pricing breakdown, see our main decking page.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
None of these three is wrong for every deck. What is wrong is choosing on upfront price without knowing what the upkeep commitment looks like.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Wood here means redwood, which is a premium natural material. Anyone comparing it against composite on the assumption that wood is cheaper is comparing against a product that is not on the list.
Summer sun is the stress to design for in Arden Arcade. Dark composite and PVC boards run hotter underfoot than light ones, and unshaded redwood weathers faster under strong UV. For a south- or west-facing deck, a lighter board color, a shade structure, or both usually matter more than the brand.
Every line here has a track record long enough to judge. The question is which color and texture you want to look at for twenty-five years.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Whenever a deck attaches at a door or rises more than a couple of feet off the ground, assume a permit until Sacramento County confirms otherwise, since retroactive permitting costs more than filing at the outset.
A deck typically skips permitting only if it is freestanding, 200 square feet or smaller, no more than 30 inches above grade, and not the required exit from a door. Attach it to the house, build it larger, or build it higher, and it generally needs a permit and inspections.
When a permit is required, we draw the plans, submit them to Sacramento County, and schedule each inspection ourselves.
The parts of a deck an inspector cares most about are the parts a homeowner never sees once the boards go down.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Inspections usually happen at the footing stage, again at framing and ledger attachment, and at final. Improperly lapped ledger flashing is one of the more common reasons a deck fails an inspection, so we flash it to the manufacturer's specification during framing.
An elevated deck is a different structural problem from a ground-level one, not a taller version of the same project.
Homes near Sierra Oaks and Del Paso Manor sit on a mix of flat and sloping parcels, which is why the footing layout gets designed at the property rather than from a standard pattern.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
A deck is built in a fixed order because the inspections are sequenced, and an inspection cannot happen after the thing it inspects is covered.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Most projects are one to three weeks from the first day on site to final sign-off, assuming the permit is already through.
Permit review adds time at the front end and varies with the current plan check queue. An elevated or second-story deck runs longer than a ground-level build because of the deeper footings and extra inspection stages.
Composite is often sold as maintenance-free. Refinishing-free is the accurate version, and it is still the main reason homeowners choose it.
We carry multiple decking lines rather than a single stocked product, so the recommendation follows your span, your height above grade, and how you plan to use the deck instead of whatever inventory a franchise needs to move. Our in-house crews, who self-perform most of the work, do the framing, so the person who set your footings and attached your ledger is accountable through the final walkthrough, not a rotating out-of-area crew swapped in mid-project. Sacramento County is the permit authority here, and when a permit is required, GVD handles the permitting process and builds to the footing and ledger details county inspectors check. In Sierra Oaks, Del Paso Manor, and Arden Park, where architectural review can govern deck placement and materials, we plan the scope around those requirements before framing begins.
We have worked through plan review with Sacramento County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
We bring the same crews, materials, and workmanship to every community around Arden Arcade.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through Sacramento County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















