
GVD designs and builds decks in Gold River and nearby Rancho Cordova and Folsom, designed around summer heat and UV. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Gold River deck project with GVD, before your own site is measured.
From low platforms off a back slider to elevated decks on steep lots, GVD Renovations handles deck design, permitting where required through Sacramento County, and construction in Gold River. We are licensed (#989637) and carry liability and workers' compensation coverage. We also build decks in nearby Rancho Cordova, Folsom, and Rio Linda, and every design starts with a measurement of your grade and attachment point.
The first material decision on a deck is not the board color, it is whether you want to sand and reseal wood on a recurring cycle or step off that cycle entirely with a capped composite surface. Wood decking asks for periodic refinishing to hold its look and protect the fibers, while composite trades that upkeep for a different upfront cost and a different repair path. We walk you through which cycle you are choosing into before we quote, because that choice shapes the boards, the fasteners, and the long-term labor you sign up for.
Our project managers are GVD staff, and the same one owns the job from the first measurement through final sign-off, including the inspections.
Footings and framing are the part of a deck you never see once it is finished, and on most quotes they are the majority of the price, not the surface boards homeowners tend to compare. Knowing that the structure below drives the number keeps the board selection in proportion when you start pricing options.
Square footage sets the surface cost and the grade sets the structural cost, and on a sloped lot the second can exceed the first.
| Deck type | Typical range | Notes |
|---|---|---|
| Composite, standard size | $17,000–$30,000 | Low upkeep, the usual choice |
| Redwood | $25,000–$35,000 | Natural grain; needs refinishing |
| Full PVC or stone surface | $30,000–$45,000 | Best moisture and stain resistance |
| Large custom, covered, or waterproofed | $45,000–$100,000+ | Multi-level, covered, or over living space |
A $5,000 budget buys a small ground-level pressure-treated deck under 100 square feet, which is worth stating so the tiers above have a lower bound to read against.
The complete cost breakdown is on our main decking page.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
The most useful way to read the table below is by which column represents the constraint that actually binds for your household.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
If the reason for considering wood is budget, the pricing above suggests reconsidering, since composite comes in below it and needs no refinishing cycle.
Summer sun is the stress to design for in Gold River. Dark composite and PVC boards run hotter underfoot than light ones, and unshaded redwood weathers faster under strong UV. For a south- or west-facing deck, a lighter board color, a shade structure, or both usually matter more than the brand.
A homeowner choosing between decking brands is usually really choosing between capped composite and full PVC, which is a construction decision rather than a badge.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Decks range from a low freestanding platform to an engineered second-story structure, and Sacramento County draws the permit line somewhere in that range based on attachment, height, and size.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
When a permit is required, we draw the plans, submit them to Sacramento County, and schedule each inspection ourselves.
Most of what code requires on a deck is invisible in the finished product, which is exactly why the inspection stages are sequenced the way they are.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
Inspections usually happen at the footing stage, again at framing and ledger attachment, and at final. Improperly lapped ledger flashing is one of the more common reasons a deck fails an inspection, so we flash it to the manufacturer's specification during framing.
Height above grade changes the guardrail requirement, the footing depth, the post sizing, and the number of inspection stages, all at once.
The structural half of a deck quote is the half that varies most between properties, because it follows the site rather than the plan.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
What follows is the order the work actually happens in, from the measurement through the final walkthrough.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Crews are typically on a deck replacement for one to three weeks. Permit review and material lead time both sit outside that window.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
A light routine keeps a composite deck looking close to new for a long time, and skipping it entirely is what makes people think the material failed.
The question that matters most three years after a build is who answers when a board cups or a railing connection loosens. We are a licensed contractor working in the Sacramento County area, so the same company that built the deck is the one you call back, and a license means an accountable party with something to lose if the work fails. A national franchise routes that call through rotating out-of-area crews, and the person who framed your ledger is often long gone. When a permit is required for your deck, GVD handles the permitting process through Sacramento County, so the plan review and inspections run through us. One coordinated team carries the job from the first measurement through the final walkthrough.
We bring the same crews, materials, and workmanship to every community around Gold River.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with Sacramento County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















