
Decks in Sonoma and nearby Novato and Yountville, with heat-conscious board colors for full-sun decks. Composite, redwood, or PVC, framed to code at one fixed price in a detailed proposal.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Sonoma deck project with GVD, before your own site is measured.
Homeowners in Sonoma hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through the City of Sonoma or Sonoma County when a permit applies, and build it under California license #989637 with full insurance. We also build decks in nearby Novato, Yountville, and Sebastopol, and every design starts with a measurement of your grade and attachment point.
The first material decision on a deck is not the board color, it is whether you want a surface you refinish on a recurring cycle or one that skips the sanding and resealing routine. Wood species and composite lines sit on opposite ends of that maintenance commitment, and the difference shows up every few years for the life of the deck, not just on install day. We walk through both paths at the estimate so you choose the upkeep schedule you actually want to live with.
Our project managers are GVD staff, and the same one owns the job from the first measurement through final sign-off, including the inspections.
Height above grade is the single measurement that sets footing depth, how much structural support the frame needs, whether code requires a guardrail, and which permit path applies, all at once. Because one dimension moves four cost drivers together, knowing your deck's height above grade before you call keeps every number that follows grounded in your actual site.
A deck budget is really two budgets: the structure underneath, which is set by the site, and the surface on top, which is set by taste.
The floor of the range is around $5,000 for a small ground-level pressure-treated deck under 100 square feet, useful mostly as a reference point for what the minimum looks like.
The complete cost breakdown is on our main decking page.
Two quotes for the same footprint usually differ mainly on the surface material, since the framing, footings, and railing underneath carry a similar base cost. What pushes an elevated or second-story deck higher is the deeper footing work and added structure.
The comparison below is about how each material behaves over a decade of ownership rather than what it costs on invoice day.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Redwood costs more than standard composite and asks more of the owner afterward. It earns its place on appearance, which is a legitimate reason, just not a budgetary one.
In Sonoma's hot, sunny summers, color is a comfort decision as much as a design one. Composite and PVC absorb radiant heat, so a dark board in full afternoon sun runs noticeably warmer underfoot than a light one. Manufacturers publish comparative surface-temperature data by color; ask to see it for the line you are considering, and consider a lighter color or shade for the sunniest exposure.
Ask to see full-size boards rather than samples. Color and texture read very differently at scale, and that is the decision you live with.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
Whenever a deck attaches at a door or rises more than a couple of feet off the ground, assume a permit until the City of Sonoma or Sonoma County confirms otherwise, since retroactive permitting costs more than filing at the outset.
A deck typically skips permitting only if it is freestanding, 200 square feet or smaller, no more than 30 inches above grade, and not the required exit from a door. Attach it to the house, build it larger, or build it higher, and it generally needs a permit and inspections.
GVD prepares the plans, submits for plan check, and schedules the inspections with the City of Sonoma or Sonoma County when a permit applies, so you are not tracking down a separate expediter.
A deck that meets code at the ledger and the footings will outlast its decking surface. One that does not will not, whatever goes on top.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Inspections usually happen at the footing stage, again at framing and ledger attachment, and at final. Improperly lapped ledger flashing is one of the more common reasons a deck fails an inspection, so we flash it to the manufacturer's specification during framing.
Designing an elevated deck starts with the footing layout and works upward, which is the reverse of how most homeowners imagine the process.
Two houses on the same street can need very different structures underneath the same size deck, depending entirely on grade.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
Each stage below either has to be inspected or has to be structurally complete before the next one starts, which is what sets the calendar.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Budget one to three weeks on site. Elevated and second-story builds run longer because of footing depth and the extra inspection stages.
Permit review adds time at the front end and varies with the current plan check queue. An elevated or second-story deck runs longer than a ground-level build because of the deeper footings and extra inspection stages.
Keeping a deck clean is mostly about preventing grit from being ground into the surface underfoot, which is why sweeping matters more than washing.
On a deck, the structural scope is dictated by the site, so the risk is that costs shift once framing starts and the ground reveals itself. Our detailed digital proposal is a firm total price against the scope we measure at your property, and the number you approve is the number you pay, with no surprise charges once the crew is on site. The work is carried out by one accountable GVD team from quote to walkthrough, rather than the rotating out-of-area crews a national franchise routes through Sonoma. When a permit is required, GVD handles the permitting process with the City of Sonoma or Sonoma County, so you are not the one deciphering which authority reviews your plans or which footing details an inspector will flag.
We have worked through plan review with the City of Sonoma or Sonoma County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
We bring the same crews, materials, and workmanship to every community around Sonoma.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the City of Sonoma or Sonoma County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















