Decades of trapped winter moisture hide behind old lap siding on Newcastle homes. When walls show it, GVD tears off to bare sheathing, repairs the damage, and re-clads in fiber cement built for 100-degree valley summers, in a free detailed quote.
Manufacturers rank the contractors who install their siding. We hold the highest level with both, and in January 2026 James Hardie presented us its 2025 Service Excellence Award.

GVD has re-sided homes across the Newcastle area, and this is a sample of that recent work. James Hardie Elite and LP SmartSide Platinum certified, licensed under CSLB #989637, with every project quoted free and delivered as a detailed digital proposal.


Planning a siding or window project in Newcastle? Real products we install, with your home’s shape, rooflines and windows kept the same. Free.
License #989637 | 4.9/5 across 921+ reviews | James Hardie Elite + LP SmartSide Platinum | James Hardie Service Excellence Award (2025 award, presented January 2026), the only California contractor to win it
Newcastle has almost no new houses: Census data puts only about 5 percent of its roughly 700 homes in 2000 or later, and the median home dates from 1978. That means nearly every exterior in town is either original or on its second round of siding, and the real question is usually whether yours can still be repaired.
These are actual GVD exterior projects from the Newcastle area. See the transformations for yourself.
An overlay, meaning new siding fastened over the old, only works when the existing wall is flat, dry and firm, and on a 45-year-old house that is the exception. It also thickens the wall at windows and doors, so the trim has to be extended to suit.
At the estimate, GVD looks at and handles the existing boards: soft spots, swelling, open joints and how the siding is nailed off. Sheathing damage only becomes visible once the old siding is removed, so the quote carries sheathing repair as a separate line instead of folding a guess into the total.
Census counts for the Newcastle CDP show about 700 homes, a 1978 median, and more construction in the 1970s than any other decade. About 56 percent predate 1980, about 40 percent came between 1980 and 1999, and about 14 percent are older than 1960. ZIP 95658, which adds the rural parcels around town, has about 2,400 homes with a median of 1980. See our Census housing data.
Homes built in the 1970s and 1980s commonly went up with T1-11 plywood panels, hardboard lap or cedar. If your siding is original, here is how each one tends to break down:
The 14 percent of homes older than 1960 may still have original wood boards under later paint. Any house built before 1978 can have lead in older paint layers, which affects how the old siding has to be removed and hauled away.
Across GVD's Sacramento-region and foothill service area, James Hardie fiber cement typically comes to about $20 to $30 a square foot installed, a figure that includes tear-off of the old siding, trim and paint. LP SmartSide engineered wood typically lands somewhat below that, and vinyl runs roughly $12 to $20 a square foot.
Wall area, trim and sheathing repair move a Newcastle quote, and on a 1970s house the sheathing is the least predictable because nobody sees it until the old boards are off.

Enter your ZIP and answer a few quick questions for a typical price range in your area, based on real local projects including our own.
No appointment required.| Material | What it handles well here | Watch-outs | Typical installed price |
|---|---|---|---|
| Fiber cement (James Hardie) | Replaces swollen hardboard or flaking T1-11 with a board that does not absorb water; Class A fire rated on its own | Heavier and slower to install; needs proper flashing at every window | About $20 to $30 per sq ft including tear-off, trim, paint |
| LP SmartSide engineered wood | Closest look to original cedar lap or grooved panel; lighter boards | Combustible; paint and sealed cut edges have to be kept up | Typically somewhat below fiber cement |
| Vinyl | Lowest cost; no repainting | Can soften and melt under radiant heat in foothill fire country; hard to match on a partial repair | About $12 to $20 per sq ft |
Fiber cement carries a Class A fire rating by itself, which matters on a foothill lot. Fire zone detail for town is on our James Hardie siding in Newcastle page, and our siding page compares the products further.
Newcastle is unincorporated, so Placer County, not a city, issues the building permit. Stripping the old siding and installing new requires one.
The county office that covers Newcastle is in Auburn at 3091 County Center Drive. If your property falls under CC&Rs or an HOA, a change in color or profile may need its sign-off too.
GVD Renovations holds James Hardie Elite Contractor status and won James Hardie's 2025 Service Excellence Award. We are licensed in California (#989637), carry liability and workers' compensation insurance, and send our own installers, with one project manager on your job from the estimate to the final walkthrough. For the original homeowner, a whole-home re-side comes with a 15-year labor warranty on top of the manufacturer's product warranty; smaller siding jobs carry a 2-year workmanship warranty.
Ready to see your Newcastle home in siding built for valley summers? Request your free quote today, claim $1,500 off your project, and get a free design rendering, no obligation.
Trusted by Thousands of Homeowners Across Northern California
We bring the same crews, materials, and workmanship to every community around Newcastle.
View All Service Areas →Only if the plywood is still solid. Once the bottom edges have started to separate into layers, paint will not hold them together, and the damage keeps working upward. Repainting can buy time on panels that are sound. Where the plies are flaking, replacing the siding and checking the sheathing behind it is the lasting fix.
Yes, when the damage is local and a matching board exists. Cedar is usually easy to match; older hardboard profiles often are not, which can mean redoing a whole wall so the seams line up. If the bottom course is failing on every side, a partial repair will not stop it.
It depends entirely on what is under the old siding, which nobody can see before tear-off. That is why GVD lists sheathing repair as its own line item on the quote. On a house from the 1970s, it is the part of the price most likely to change once work begins.
Only if your property is in a subdivision with CC&Rs or an active homeowners association. If it is, a new color or profile may need approval before work starts, separate from the Placer County permit. Your deed and any association documents will say whether one applies.