
A new Kentfield deck built for damp marine air and shaded yards: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving Fairfax and San Anselmo.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
Homeowners in Kentfield hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through Marin County when a permit applies, and build it under California license #989637 with full insurance. Recent site visits have ranged from Kent Woodlands to nearby Fairfax and San Anselmo, and every design starts with a measurement of your grade and attachment point.
Two deck quotes only compare when they assume the same footprint, the same height above grade, and the same attachment method to the house. Change any one of those and you are pricing a different structure, even if the finished deck looks identical from the yard. Ask each contractor to state footprint, height above grade, and how the deck attaches, then read the numbers against those three fixed assumptions.
The estimate is where a deck project is decided, because that is when somebody either does or does not work out what the grade, the ledger location, and the footing depth are going to require.
Two decks with the same layout cost different amounts when one sits on a flat lot and the other on a slope, because grade changes the footing depth, post height, and framing the structure needs. Confirm whether your lot is flat or sloped before you compare any figures, since that single site fact reorders most of the structural budget.
What a deck costs is decided largely before any material is chosen, by the shape of the lot and where the deck meets the house.
Below the tiers above, a small pressure-treated ground-level deck under 100 square feet sits near $5,000. It is a genuine option on a tight budget and a modest one.
Our main decking page walks through pricing in more detail.
Two quotes for the same footprint usually differ mainly on the surface material, since the framing, footings, and railing underneath carry a similar base cost. What pushes an elevated or second-story deck higher is the deeper footing work and added structure.
Decking materials diverge most on the elevations that get the hardest sun and the least airflow, which is where an unmaintained wood surface degrades first.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Note the cost order, because it is the reverse of the usual assumption: redwood sits above standard composite here. The wood option is a premium material rather than a budget one, so the composite decision is not about paying more now to save later.
In Kentfield's marine air, moisture is the bigger concern than heat. Shaded corners and the north side of a deck can stay damp long enough to grow mildew on any surface, so board spacing, airflow under the frame, and a cleaning routine matter more here than board color. Capped composite and full PVC handle the damp better than wood.
Brand matters less on decking than most marketing suggests, and construction type matters more.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Guardrail height, stair geometry, and ledger attachment are all inspected where a permit applies, and Marin County determines whether your project reaches that threshold.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
GVD prepares the plans, submits for plan check, and schedules the inspections with Marin County when a permit applies, so you are not tracking down a separate expediter.
A deck is one of the few residential structures where a code failure has immediate consequences, which is why the inspection sequence is as prescriptive as it is.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
Elevated decks concentrate their cost below the decking, in footings and posts, which is why two decks of identical square footage can price very differently.
In Kent Woodlands, the deciding factor is how fast the ground falls away from the house, and that is measured on site rather than assumed.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
A deck is built in a fixed order because the inspections are sequenced, and an inspection cannot happen after the thing it inspects is covered.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Most projects are one to three weeks from the first day on site to final sign-off, assuming the permit is already through.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
Wood adds refinishing on a cycle to everything below. That is the maintenance difference between the materials, and it is the whole of it.
Our Rocklin showroom on Five Star Blvd lets you stand in front of full-size decking boards, railing systems, and actual colors instead of judging a project from a sample chip in your hand. Grain, board width, and how a color reads in daylight are easier to commit to at full scale. From there, one coordinated team carries your Kentfield deck from quote through the final walkthrough, so the people who measured your lot are accountable for what gets built. Kentfield decks fall under Marin County, and when a permit is required, GVD handles the permitting process. If your home sits in Kent Woodlands, we can factor any architectural review requirements into the plan before framing begins.
We have worked through plan review with Marin County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
Recent deck building projects we have completed in nearby communities:
We bring the same crews, materials, and workmanship to every community around Kentfield.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with Marin County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















