
GVD designs and builds decks in Foster City and nearby San Mateo and Millbrae, built for damp marine air and shaded yards. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
Homeowners in Foster City hire GVD Renovations for everything from simple ground-level decks to multi-level structures. We design the deck, take it through the City of Foster City or San Mateo County when a permit applies, and build it under California license #989637 with full insurance. We also build decks in nearby San Mateo, Millbrae, and Daly City, and every design starts with a measurement of your grade and attachment point.
Whether the deck will hold a dining table, a hot tub, or a run of built-in benches decides its footprint, and that footprint decides how many stairs and how much railing you actually need. We start from how you plan to use the space, then size the framing, the stair runs, and the railing to match. That order matters, because a deck built to a use plan costs less to change on paper than after the footings are set.
We commit to a firm total price before work starts, which is possible because the structural scope gets settled at the estimate rather than discovered during framing.
Framing, footings, and railing carry a base cost that holds steady once we measure your site, so those numbers move less from quote to quote than most homeowners expect. The decking material is what separates one bid from another, which is why comparing quotes means comparing surface choices against the same structure underneath.
Knowing which tier your deck falls into before you call keeps the conversation grounded, because the tiers differ by structure rather than by finish.
If the budget is the binding constraint, the entry point is around $5,000 for a small ground-level pressure-treated deck under 100 square feet.
For the full pricing breakdown, see our main decking page.
Every decking material trades something. Wood trades maintenance for a natural surface, composite trades a premium for a fixed cap, PVC trades more premium for maximum resistance.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Most decking advice assumes wood is the cheap option and composite the upgrade. That holds for pressure-treated pine and not for redwood, which is what sits in the wood tier above.
Damp, cool air shapes deck choices in Foster City more than summer heat does. Decks that sit in shade or get little airflow underneath are the ones that show mildew, so we pay attention to ventilation under the frame and steer shaded areas toward capped composite or PVC rather than wood.
The practical differences between these brands sit in the details a homeowner will actually touch: board texture, color consistency, and how the railing meets the post.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
A deck serving as the exit path from a door is treated differently from a detached platform in the yard, and the City of Foster City or San Mateo County will say which category a given design falls into.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the City of Foster City or San Mateo County as part of the job.
Structural review on a deck is not a formality. Ledger attachment and footing bearing are the two details that decide whether the structure holds its load.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
Inspections usually happen at the footing stage, again at framing and ledger attachment, and at final. Improperly lapped ledger flashing is one of the more common reasons a deck fails an inspection, so we flash it to the manufacturer's specification during framing.
Height above grade changes the guardrail requirement, the footing depth, the post sizing, and the number of inspection stages, all at once.
A deck gets designed against the actual grade at the back of the house, which is why the first visit is a measurement rather than a material conversation.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
Knowing the sequence helps a homeowner read progress, since a deck spends a surprising share of its build looking like bare framing.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
A deck replacement takes one to three weeks of construction in most cases, with the grade and the inspection sequence as the two variables that extend it.
Permit review adds time at the front end and varies with the current plan check queue. An elevated or second-story deck runs longer than a ground-level build because of the deeper footings and extra inspection stages.
Upkeep on a modern deck is closer to cleaning a patio than to maintaining a wood structure, which is the point of the material.
Our Rocklin showroom on Five Star Blvd lets you handle full-size deck boards, walk the railing systems, and see finished colors under real light rather than guessing from a sample chip the size of a business card. A board that looks right on a two-inch swatch can read very differently across a full span, and seeing it in person before you commit is worth the visit. Our in-house crews, who self-perform most of the work, build what you approve, so the person who quotes your deck and the team that frames it answer to the same shop. On a home in a market like Foster City, where the median value sits near $1.9 million that continuity protects the work. When a permit is required, GVD handles the permitting process with the City of Foster City or San Mateo County.
Having taken decks through the City of Foster City or San Mateo County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
We bring the same crews, materials, and workmanship to every community around Foster City.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of Foster City or San Mateo County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















