
Decks in Fairfax and nearby San Anselmo and Larkspur, designed for cool, damp bayside conditions. Composite, redwood, or PVC, framed to code at one fixed price in a detailed proposal.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Fairfax deck project with GVD, before your own site is measured.
GVD Renovations designs, permits, and builds decks in Fairfax, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by the Town of Fairfax or Marin County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby San Anselmo, Larkspur, and San Rafael, and every design starts with a measurement of your grade and attachment point.
The point where a deck attaches to the house, the ledger, is the detail that lets water into a wall cavity when it is flashed carelessly, and that damage stays hidden until the framing behind the siding is already compromised. Flashing the ledger correctly the first time means integrating the metal with the house's water barrier before the boards ever go down, because you cannot inspect or redo it later without pulling the deck apart. GVD details the ledger and its flashing at the estimate rather than treating it as a field decision.
We are a licensed local contractor rather than a franchise routing your deck to rotating out-of-area crews, and the crew that shows up is the one we manage.
Most of a deck quote is what you never see once the boards are on, the footings that carry the load and the framing that ties into the house, while the decking material is the choice most homeowners spend their time on. Knowing that the structure below drives the number keeps you from judging bids on board type alone.
Height above grade is the variable homeowners underestimate. It drives the footing depth, the structural support, the guardrail requirement, and the permit path all at once.
If the budget is the binding constraint, the entry point is around $5,000 for a small ground-level pressure-treated deck under 100 square feet.
Our main decking page walks through pricing in more detail.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
The material decision is about maintenance interval and service life more than about appearance, since all three options can be specified to look good on install day.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
A pressure-treated deck is genuinely the budget option and sits below all of these tiers. Redwood is not, and conflating the two is the most common mistake in a decking conversation.
In Fairfax's marine air, moisture is the bigger concern than heat. Shaded corners and the north side of a deck can stay damp long enough to grow mildew on any surface, so board spacing, airflow under the frame, and a cleaning routine matter more here than board color. Capped composite and full PVC handle the damp better than wood.
Every line here has a track record long enough to judge. The question is which color and texture you want to look at for twenty-five years.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Where a deck is ledger-attached or elevated, a permit is typically part of the job. The Town of Fairfax or Marin County sets the threshold, and GVD confirms it against your design at the estimate.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
GVD prepares the plans, submits for plan check, and schedules the inspections with the Town of Fairfax or Marin County when a permit applies, so you are not tracking down a separate expediter.
Guardrails, stair geometry, and baluster spacing are the code items a homeowner is most likely to notice, and the framing items are the ones that matter more.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
Inspections usually happen at the footing stage, again at framing and ledger attachment, and at final. Improperly lapped ledger flashing is one of the more common reasons a deck fails an inspection, so we flash it to the manufacturer's specification during framing.
A second-story deck adds an engineering dimension to the project: the ledger has to carry more, and the footings have to go deeper.
Two houses on the same street can need very different structures underneath the same size deck, depending entirely on grade.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
The middle of this sequence is where a project either stays on schedule or does not, because that is where the inspections fall.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Expect one to three weeks of build time once approvals are in hand. A ground-level deck sits at the short end and an elevated build at the long end.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
The maintenance case for composite is real and worth stating precisely: no sanding, no staining, no sealing. Cleaning still applies.
Our in-house carpenters, who self-perform most of the work, carry each deck from framing through the final walkthrough, so the same people who set the footings and cut the ledger connection are the ones accountable at the end, unlike rotating out-of-area crews who hand off the joints that decide whether a deck stays sound. Those connections do not forgive a handoff. When a permit is required in Fairfax, GVD handles the permitting process with the Town of Fairfax or Marin County, so the plan review and inspection sequence is coordinated by one accountable team rather than left to you. With Fairfax homes carrying a median value of $1.24 million the structure attached to that house is worth building right, and our showroom lets you compare decking and railing options in person before you commit to a fixed total price.
Recent deck building projects we have completed in nearby communities:
We bring the same crews, materials, and workmanship to every community around Fairfax.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the Town of Fairfax or Marin County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















