A shower remodel can cost $12,000 or more than $35,000, and the difference comes down to a handful of choices: panels or tile, a shower base or a tiled floor, a curb or no curb, and whether the plumbing moves. This guide breaks down what each type of shower costs in the Sacramento area, based on GVD Renovations' recent projects, and explains what pushes a project up or down.
In the Sacramento area, an acrylic shower replacement in the same spot typically costs $12,000 to $20,000. A walk-in or barrier-free shower runs about $14,000 to $20,000, a tub-to-shower conversion $15,000 to $22,000, and a custom tiled shower $20,000 to $35,000 or more. Frameless glass, a bench, moving the drain or valve, and hidden water damage add to those ranges.
Shower remodel cost by type
| Type of shower | Typical cost | Time on site |
|---|---|---|
| Acrylic shower replacement | $12,000 to $20,000 | 1 to 2 days |
| Walk-in / barrier-free shower | $14,000 to $20,000 | About 1 week |
| Tub-to-shower conversion | $15,000 to $22,000 | About 1 week |
| Custom tiled shower | $20,000 to $35,000+ | 1 to 2 weeks |
Based on recent GVD shower projects in the Sacramento area. They include removal of the old shower, the new walls and base or floor, the valve and trim, and clean-up. Permits and inspections can add days to the calendar even when the installation itself is short.
If the shower is part of a larger bathroom project, see our bathroom cost calculator for whole-bath ranges.
What common add-ons cost
| Add-on | Typical cost |
|---|---|
| Frameless glass shower door | $2,800 to $4,500 |
| Built-in shower bench | $750 to $1,500 |
| Shower niche | $300 to $600 |
| Grab bars and accessibility hardware | $300 to $1,000 |
Typical ranges on recent GVD projects.
Walls: acrylic panels vs tile
The wall material is the biggest single choice in a shower remodel.
Acrylic or solid-surface panels are large, grout-free sheets made to fit your shower. They install in a day or two, there's no grout to clean or reseal, and the wall system we install carries the manufacturer's limited lifetime warranty. Panels come in solid colors and stone and tile looks. This is the fastest and lowest-cost way to replace a shower in the same footprint.
Tile gives you unlimited choice of size, color, pattern and texture, including large-format porcelain and marble looks. It costs more because it takes more steps: a waterproofing system behind the tile, setting the tile, grouting and curing. Labor goes up with small tiles, detailed patterns, niches and trim.
| Acrylic panels | Tile | |
|---|---|---|
| Typical cost | Lower | Higher |
| Install time | 1 to 2 days | 1 to 2 weeks |
| Grout | None | Needs cleaning; sealing for cement grout |
| Design choice | A set range of colors and patterns | Almost unlimited |
| Best for | Fast, low-maintenance replacement in the same space | Custom sizes, curbless designs and a specific look |
For a closer look at panel options, see our guide to shower wall panels.

The floor: shower base vs tiled floor
A prefabricated shower base (also called a shower pan) is a one-piece floor with the slope built in. It's faster, has no grout lines on the floor and is less likely to leak. Bases come in standard sizes, so they suit replacements in a standard footprint. See our guides to shower bases and shower pan sizes.
A tiled floor is built on site: a sloped mortar bed or foam tray, a waterproof membrane, then tile. It fits any size or shape and is required for most curbless designs, but it takes longer and costs more.
Walk-in, low-threshold and curbless showers
A walk-in or low-threshold shower has a very low curb, usually with a low-profile base. It's easier to step into than a standard shower, and on recent GVD jobs these have run about $14,000 to $20,000.
A curbless (zero-threshold) shower has no step at all, so the bathroom floor flows straight into the shower. That's ideal for wheelchairs and aging in place, but the shower floor has to be recessed so water drains toward the shower instead of the bathroom. That can mean cutting into the subfloor, which is why curbless showers cost more and are priced after a site visit. See shower threshold heights for what code requires and walk-in showers in Sacramento for what we install.
Tub-to-shower conversions
Replacing a bathtub with a shower in the same footprint typically costs $15,000 to $22,000 at GVD. It costs more than a straight shower replacement because the tub comes out, the drain and valve usually move, and the new shower needs waterproofing, walls, glass and trim. If it's the only tub in the home, think about resale before removing it, especially in family neighborhoods. Learn more on our tub-to-shower conversions page.

Hidden costs: water damage, plumbing and permits
Water damage behind the walls
An old shower often hides rotted subfloor, wet framing or mold, especially around a leaking valve or a failed grout line. This only shows once the old walls come off. A good estimate explains how repairs will be priced if they're found, so the cost doesn't come as a surprise.
Moving or upgrading plumbing
Keeping the drain and valve where they are is the cheapest option. Moving the drain, adding a second showerhead, a handheld or body sprays, or upgrading to a pressure-balancing or thermostatic valve adds plumbing labor and parts. Older homes may also need galvanized pipe replaced.
Permits and inspections
Shower work that changes plumbing generally needs a permit and inspection in Sacramento-area cities and counties. Inspections can stretch a job that takes one day to install into a few days on the calendar.
Glass
A shower curtain costs almost nothing, a framed door is moderate, and frameless glass typically runs $2,800 to $4,500. Glass is measured after the walls are finished and usually takes one to two weeks to arrive.
Can a shower be replaced in one day?
Yes, in some cases. An acrylic or solid-surface shower installed in the same footprint can often be installed in a single day. In California, though, permits and inspections usually stretch the project to a few days from start to finish. Read more in our one-day bathroom remodel guide.
Where to save and where not to
Good places to save:
- Keep the shower in the same footprint, with the drain and valve where they are.
- Choose acrylic panels instead of tile if you want speed and low maintenance.
- Use a prefabricated base instead of a tiled floor.
- Choose a standard-size framed or semi-frameless door.
Places not to cut:
- Waterproofing behind tile. It's invisible once finished and expensive to fix later.
- The valve. A quality pressure-balancing valve protects against sudden temperature changes.
- Repairs to rot or water damage found during demolition.
- A licensed contractor. Check the license and insurance on the California Contractors State License Board website.
Thinking of only replacing the tile? See our guide to the cost to retile a shower.
Frequently Asked Questions
How much does it cost to remodel a shower in Sacramento?
Most shower remodels in the Sacramento area cost $12,000 to $22,000 for an acrylic replacement, walk-in shower or tub-to-shower conversion. A custom tiled shower typically runs $20,000 to $35,000 or more.
Is it cheaper to replace a shower or retile it?
Acrylic panels in the same footprint are usually the lowest-cost full replacement. Retiling only makes sense when the base and waterproofing behind the tile are in good shape, which is hard to know until the old tile comes off.
Are acrylic shower panels cheaper than tile?
Yes, usually. Panels cost less in labor, install in one to two days and have no grout. Tile costs more because of waterproofing, setting, grouting and curing.
Why does a curbless shower cost more?
The shower floor has to sit lower than the bathroom floor so water drains the right way. That often means recessing the subfloor and building a custom sloped floor with a waterproof membrane, which adds labor.
Is a tub-to-shower conversion worth it?
For many households, yes, especially for easier access and aging in place. Keep at least one tub in the home if you expect to sell to families with young children.
What warranty comes with a GVD shower?
GVD includes a 2-year labor warranty on every shower. The acrylic wall system also carries the manufacturer's limited lifetime warranty.
Sources
- California Plumbing Code (Title 24, Part 5), shower requirements
- California Contractors State License Board: license lookup
Checked November 2026. Prices change with materials and scope, and permit rules vary by city and county; confirm locally before you rely on them.
Get a Price for Your Shower
GVD Renovations has replaced and remodeled showers across the Sacramento region since 2013. See our shower replacement services, get a range in about a minute with the bathroom cost calculator, or visit our Rocklin showroom (6848 Five Star Blvd #6) to compare panels, tile and glass with a designer. GVD Renovations Inc. is licensed by the California Contractors State License Board (#989637) and insured.

- Free design renderings
- Help choosing materials at our Rocklin showroom
- One project manager from start to finish
GVD is a good company. All associates very professional and helpful. We are very happy with the installation of shower. Viktor did excellent on the installation. Thanks Rich & Lola
From in home estimate to project installation and completion, everyone we dealt with was polite, knowledgeable, upfront and honest. Communication was excellent. We love our new walk-in shower. Thank you.
GVD did an outstanding job remodeling our guest bathroom! We converted a tub/ shower to shower only, replaced the vanity, toilet and floor. They worked with me because I purchased some of the materials toilet vanity etc. Viktor was my installer and he was great as were the project manager.
Reviewed by our team at GVD Renovations, a licensed general contractor. While we strive for accuracy, project specifics vary. Contact us for a personalized assessment. Product details, specifications, or warranties may have changed since publication. Brand and product mentions reflect our professional opinion, not endorsements or guarantees.
Tags: shower remodel cost, shower replacement cost, tub to shower conversion cost, sacramento,
Written by Paul Kho