
A new El Macero deck with heat-conscious board colors for full-sun decks: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving West Sacramento and Davis.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical El Macero deck project with GVD, before your own site is measured.
From low platforms off a back slider to raised decks off upper-floor doors, GVD Renovations handles deck design, permitting where required through Yolo County, and construction in El Macero. We are licensed (#989637) and carry liability and workers' compensation coverage. We also build decks in nearby West Sacramento, Davis, and Dixon, and every design starts with a measurement of your grade and attachment point.
How fast the ground drops away from your house sets the structure of the deck, because a level backyard and a steep fall from the door call for different footing depths and framing heights. That single measurement often drives the permit path and the majority of the cost, and it is invisible in any finished photo. We measure the height above grade and read the slope at the estimate, then quote one fixed total against what the ground actually does.
The work is managed in-house end to end, which is what keeps the schedule and the inspection sequence under our control rather than a supplier's.
Footings and framing, the parts you never see once the boards go down, are the majority of most deck quotes, while the board selection homeowners focus on is a smaller share of the total. Knowing that split before you call keeps every later conversation about the deck honest.
The useful question at the outset is not which board you want but what the grade and the attachment point are going to require underneath it.
| Build | Installed range | Why choose it |
|---|---|---|
| Composite, standard size | $17,000–$30,000 | No staining or sealing; our most-built deck |
| Redwood | $25,000–$35,000 | Natural grain; needs refinishing |
| Full PVC or stone surface | $30,000–$45,000 | Top moisture and stain performance |
| Large custom, covered, or waterproofed | $45,000–$100,000+ | Multi-level, covered, or over living space |
A $5,000 budget buys a small ground-level pressure-treated deck under 100 square feet, which is worth stating so the tiers above have a lower bound to read against.
For the full pricing breakdown, see our main decking page.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
The most useful way to read the table below is by which column represents the constraint that actually binds for your household.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Most decking advice assumes wood is the cheap option and composite the upgrade. That holds for pressure-treated pine and not for redwood, which is what sits in the wood tier above.
In El Macero's hot, sunny summers, color is a comfort decision as much as a design one. Composite and PVC absorb radiant heat, so a dark board in full afternoon sun runs noticeably warmer underfoot than a light one. Manufacturers publish comparative surface-temperature data by color; ask to see it for the line you are considering, and consider a lighter color or shade for the sunniest exposure.
The fastener and railing system is worth as much attention as the board, since it determines how the finished deck looks from three feet away.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Most decks attached to the house, or built more than 30 inches above grade, require a building permit, because both conditions trigger structural and guardrail review. Yolo County applies that test to the specific project.
A deck typically skips permitting only if it is freestanding, 200 square feet or smaller, no more than 30 inches above grade, and not the required exit from a door. Attach it to the house, build it larger, or build it higher, and it generally needs a permit and inspections.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with Yolo County as part of the job.
The code requirements below are worth understanding because they explain most of the framing cost and all of the inspection schedule.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
Inspections usually happen at the footing stage, again at framing and ledger attachment, and at final. Improperly lapped ledger flashing is one of the more common reasons a deck fails an inspection, so we flash it to the manufacturer's specification during framing.
Where the drop is significant, stairs and landings become part of the structure rather than an accessory to it, and they carry their own code requirements.
A deck gets designed against the actual grade at the back of the house, which is why the first visit is a measurement rather than a material conversation.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
A deck cannot be compressed by working out of sequence. The open-framing inspection in particular has no substitute.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
Most projects are one to three weeks from the first day on site to final sign-off, assuming the permit is already through.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
Most complaints about composite appearance after a few years trace to cleaning that never happened rather than to the board itself.
We take deck plans through review with Yolo County regularly, so we know the ledger attachment and footing details inspectors here look at before they sign off on framing. When a permit is required for your deck, GVD handles the permitting process and builds to the details that pass inspection the first time. Our in-house crews, who self-perform most of the work, do the framing, so the people who dug the footings are the people who set the ledger, and one accountable team stays on the job from quote to walkthrough. You can see the decking boards, railing, and fastener options in our showroom and settle the choices that shape your quote before we finalize the fixed total you approve.
We have worked through plan review with Yolo County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
We bring the same crews, materials, and workmanship to every community around El Macero.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through Yolo County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















